It also covers the installation of six new intermediate block signalling (IBS) systems in specified sections between Bhingra and Pendra Road.
Also Read: RVNL secures ₹91 crore Southern Railway order for video surveillance at 484 stations
Additionally, the project entails the installation, testing and commissioning of a new section control system with headquarters and wayside train control communication equipment, a new telephone exchange, and EIMWBs at designated locations.Alterations and modifications will also be carried out at the existing panel interlocking installation at Kusmunda Block Station yard and the existing electronic interlocking installation at the East Cabin of the SECL Silo Siding yard, along with other related works.
The contract, awarded under general contract conditions, is to be executed within 11 months, including the monsoon period. The order value of ₹178.64 crore includes transportation, insurance, taxes and duties. RVNL noted that the project falls under its normal course of business.
Also Read: RVNL Q1 Results: Railway PSU stock sinks after margin for the quarter falls to 1%
Shares of Rail Vikas Nigam Ltd ended at ₹324.20, down by ₹2.05, or 0.63%, on the BSE.