Wednesday, May 27, 2026

RVNL secures railway contracts worth about ₹1,000 crore from NMDC, West Central Railway

Date:

Rail Vikas Nigam Ltd. (RVNL) secured two railway infrastructure orders worth nearly ₹1,002 crore from NMDC Ltd. and West Central Railway on Friday, May 22.In an exchange filing, the company said it received a Letter of Acceptance from NMDC for a ₹758.07 crore contract related to the development of a railway siding near Padapur village.

The scope of the project includes construction of bridges, PWD road diversion, associated civil works, feasibility and detailed project reports, detailed engineering, execution and project management consultancy services.
Also read: RVNL wins ₹129 crore Varanasi-Prayagraj railway electrification projectThe company said that the contract is to be executed over a period of 36 months.

Separately, RVNL also emerged as the lowest bidder (L1) for a West Central Railway project worth ₹244.33 crore.The project involves design, modification, supply, erection, testing and commissioning of traction substations and switching posts for the upgradation of the electric traction system from 1x25kV to 2x25kV in the Itarsi–Shridham section of Jabalpur Division to support a 3,000 MT loading target.

Also read: RVNL bags ₹164 crore railway signalling order from East Coast Railway

The West Central Railway project is scheduled to be completed within 18 months.

RVNL said both contracts were awarded in the normal course of business and do not fall under related-party transactions.

Shares of RVNL are trading 0.8% higher after the announcements at ₹273.1. The stock is down 11% over the last one month and trades well over 50% below its all-time high of ₹647 that it surged to back in 2024.

Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Jubilant Pharmova Q4 profit declines on margin pressure; revenue rises 19%

Jubilant Pharmova Ltd reported a mixed set of fourth-quarter...

8th Pay Commission: Railway union proposes 5-fitment-factor formula; salaries may jump over 400% — check calculator

भारतीय रेलवे तकनीकी पर्यवेक्षक संघ (आईआरटीएसए) ने आगामी 8वें...

Uganda traveller isolated in Bengaluru tests negative for Ebola; India says no confirmed case

A 28-year-old woman from Uganda who was isolated in...

GSFC Q4 Results: Higher expenses weigh on margins, profitability despite 37% topline growth

Shares of Gujarat State Fertilizers & Chemicals Ltd. (GSFC)...